Introducing the Catnic CX90/100 – Extra Heavy Duty Cavity Wall Lintel
Unlock the potential of your construction projects with the Catnic CX90/100 Lintel, expertly designed for 100mm cavities to accommodate brick and block masonry on both sides. Crafted from galvanized steel and fortified with a powder-coated finish, this lintel guarantees unparalleled durability and longevity, ensuring your structures stand the test of time.
Key Features:
Built to Last: The Catnic CX90/100 boasts galvanized steel construction and a powder-coated finish, ensuring strength and resistance against the elements for long-lasting performance.
Efficiency at its Core: Equipped with a built-in DPC (Damp Proof Course), our lintel not only saves you valuable time during installation but also provides added protection against moisture, contributing to the longevity of your construction.
Insulated Centre: The lintel's insulated centre enhances energy efficiency, making it a smart choice for projects where thermal performance is a priority.
Extra Heavy Duty Class: Classified as extra heavy duty, the Catnic CX90/100 is engineered to handle the toughest construction challenges, providing unparalleled support for various applications.
Versatile Applications:
Triangulated Masonry Load: Designed to support triangulated masonry loads, ensuring stability and reliability in your construction projects.
Uniformly Distributed Loads: Supporting uniformly distributed masonry, timber floor, and roof loads, providing flexibility in design and construction.
Fair-Faced Inner Leaf Masonry: Perfect for projects that demand a polished finish on the inner leaf masonry.
Concrete Floors Support: The lintel offers robust support for concrete floors, adding versatility to your construction options.
Attic Truss and Larger Span Loads: Designed to handle attic truss loads and larger span multiple truss loads, making it ideal for a wide range of construction applications.
Conditions of Use:
Nominal 150mm End Bearings: Ensure optimal performance with nominal 150mm end bearings, providing stability and reliability in your construction.
Simultaneous Leaf Elevation: Both leaves are raised together, streamlining the installation process for enhanced efficiency.
Pre-Installation Block Course: For optimal results, incorporate one course of block before the installation of floor/roof components.
For technical assistance, our knowledgeable support team at Catnic Technical Support is ready to guide you through every step. Elevate your construction projects with the Catnic CX90/100 Lintel – where strength, durability, and efficiency converge for exceptional results.
Due to supply shortages, we may supply aBirtley Lintel orIG Lintel as a direct alternative to a Catnic.
We will contact you once the order is placed to confirm the brand that will be provided.
Alternatively, please get in touch by phone or live chat before ordering if a specific brand is supplied.
Catnic
Lintel
Length
900mm
1200mm
1500mm
1800mm
2100mm
2400mm
2550mm
2700mm
2850mm
3000mm
3300mm
3600mm
3900mm
4200mm
4575mm
4800mm
{PRODUCT_DESCRIPTION}
Delivery is free to Mainland England and Wales. Deliveries are chargable to Scotland.
Once the order is placed, our courier will call you within 3 working days to arrange a delivery date. If you do not hear from the courier within 3 days, please get in touch with us. The majority of deliveries are made within 7 days, occasionally a little longer during peak periods.
Deliveries are made between 08:00 and 18:00 on the day, we request the driver calls you one hour before with an advised time.
Delivery is made via a kerbside tail lift lorry, we cannot deliver to sloping ground as the tail lift must be able to lay flat.
The road must be wide enough for a lorry to fit down and free from obstruction, if there are any access restrictions, please contact us.
Deliveries must be signed for, please report any damages to us within 24 hours.
We offer all bricks with a tail lift offloading service, Please familiarise yourself with the information below.
Crane offloading is available as a premium service for some bricks.
FAQ
All of our C16 and C24 graded timber is regularised
Regularised timber is timber that has been processed to have a uniform shape and size. This means that the wood has been sawn and planed to remove any irregularities and ensure that each piece of wood has consistent dimensions. Regularised timber is often used in construction, particularly in the framing of buildings, as it is easier to work with and can be more efficiently installed than irregularly shaped timber.
We have one of the largest ranges of timber lengths, dimensions and grades available to buy online.
The variation you require will determine the exact lead time and delivery method.
Most orders arrive within 3-4 days, the maximum is 7 days. Please get in touch before you order if you need a specifc delivery date.
Delivery charges vary by postcode. To find out the delivery charge, add the item(s) you require to your basket and select CALCULATE SHIPPING at the bottom of the page.
Some orders are delivered on our own vehicles based in Leicestershire and Cheshire. We also use carriers including Yodel and Tuffnells. For some sizes and locations we use regional distributors.
If you'd prefer crane offloading rather than tail lift vehicle offloading for your brick order then this service is available for the majority of bricks that we sell. Charges are shown at checkout.
For deliveries of less than 6 packs then Taillift offloading is normally a more cost effective option
Downloadable information can be found here:
Armstrong Cheshire supply the full range of Catnic Lintels. If you don't see the lintel you need on our website, choose from the Catnic Lintel Selector Brochure and give us a call 01625 322269
Downloadable information can be found here:
Introducing the Catnic CX90/100 – Extra Heavy Duty Cavity Wall Lintel
Unlock the potential of your construction projects with the Catnic CX90/100 Lintel, expertly designed for 100mm cavities to accommodate brick and block masonry on both sides. Crafted from galvanized steel and fortified with a powder-coated finish, this lintel guarantees unparalleled durability and longevity, ensuring your structures stand the test of time.
Key Features:
Built to Last: The Catnic CX90/100 boasts galvanized steel construction and a powder-coated finish, ensuring strength and resistance against the elements for long-lasting performance.
Efficiency at its Core: Equipped with a built-in DPC (Damp Proof Course), our lintel not only saves you valuable time during installation but also provides added protection against moisture, contributing to the longevity of your construction.
Insulated Centre: The lintel's insulated centre enhances energy efficiency, making it a smart choice for projects where thermal performance is a priority.
Extra Heavy Duty Class: Classified as extra heavy duty, the Catnic CX90/100 is engineered to handle the toughest construction challenges, providing unparalleled support for various applications.
Versatile Applications:
Triangulated Masonry Load: Designed to support triangulated masonry loads, ensuring stability and reliability in your construction projects.
Uniformly Distributed Loads: Supporting uniformly distributed masonry, timber floor, and roof loads, providing flexibility in design and construction.
Fair-Faced Inner Leaf Masonry: Perfect for projects that demand a polished finish on the inner leaf masonry.
Concrete Floors Support: The lintel offers robust support for concrete floors, adding versatility to your construction options.
Attic Truss and Larger Span Loads: Designed to handle attic truss loads and larger span multiple truss loads, making it ideal for a wide range of construction applications.
Conditions of Use:
Nominal 150mm End Bearings: Ensure optimal performance with nominal 150mm end bearings, providing stability and reliability in your construction.
Simultaneous Leaf Elevation: Both leaves are raised together, streamlining the installation process for enhanced efficiency.
Pre-Installation Block Course: For optimal results, incorporate one course of block before the installation of floor/roof components.
For technical assistance, our knowledgeable support team at Catnic Technical Support is ready to guide you through every step. Elevate your construction projects with the Catnic CX90/100 Lintel – where strength, durability, and efficiency converge for exceptional results.
Due to supply shortages, we may supply aBirtley Lintel orIG Lintel as a direct alternative to a Catnic.
We will contact you once the order is placed to confirm the brand that will be provided.
Alternatively, please get in touch by phone or live chat before ordering if a specific brand is supplied.
Catnic
Lintel
Length
900mm
1200mm
1500mm
1800mm
2100mm
2400mm
2550mm
2700mm
2850mm
3000mm
3300mm
3600mm
3900mm
4200mm
4575mm
4800mm
{PRODUCT_DESCRIPTION}
Delivery is free to Mainland England and Wales. Deliveries are chargable to Scotland.
Once the order is placed, our courier will call you within 3 working days to arrange a delivery date. If you do not hear from the courier within 3 days, please get in touch with us. The majority of deliveries are made within 7 days, occasionally a little longer during peak periods.
Deliveries are made between 08:00 and 18:00 on the day, we request the driver calls you one hour before with an advised time.
Delivery is made via a kerbside tail lift lorry, we cannot deliver to sloping ground as the tail lift must be able to lay flat.
The road must be wide enough for a lorry to fit down and free from obstruction, if there are any access restrictions, please contact us.
Deliveries must be signed for, please report any damages to us within 24 hours.
We offer all bricks with a tail lift offloading service, Please familiarise yourself with the information below.
Crane offloading is available as a premium service for some bricks.
All of our C16 and C24 graded timber is regularised
Regularised timber is timber that has been processed to have a uniform shape and size. This means that the wood has been sawn and planed to remove any irregularities and ensure that each piece of wood has consistent dimensions. Regularised timber is often used in construction, particularly in the framing of buildings, as it is easier to work with and can be more efficiently installed than irregularly shaped timber.
We have one of the largest ranges of timber lengths, dimensions and grades available to buy online. The variation you require will determine the exact lead time and delivery method.
Most orders arrive within 3-4 days, the maximum is 7 days.
Please get in touch before you order if you need a specific delivery date.
Delivery charges vary by postcode. To find out the delivery charge, add the item(s) you require to your basket and select CALCULATE SHIPPING at the bottom of the page. Some orders are delivered on our vehicles based in Leicestershire and Cheshire. We also use carriers including Yodel and Tuffnells. For some sizes and locations, we use regional distributors.
If you'd prefer crane offloading rather than tail lift vehicle offloading for your brick order then this service is available for the majority of bricks that we sell. Charges are shown at checkout.
For deliveries of less than 6 packs then Taillift offloading is normally a more cost effective option
Downloadable information can be found here:
Armstrong Cheshire supply the full range of Catnic Lintels. If you don't see the lintel you need on our website, choose from the Catnic Lintel Selector Brochure and give us a call 01625 322269
Catnic CX90/100 100mm Extra Heavy Duty Cavity Lintel - 900mm
is backordered and will ship as soon as it is back in stock.
Couldn't load collection availability
Delivery charges will vary depending on your location.
To find out delivery cost to your postcode, add the products your require to your basket and then review your basket, entering the delivery postcode
We look to dispatch all products same-day where possible, we use a close network of couriers we have worked alongside for a number of years and will share any and all shipping updates with you directly.
Introducing the Catnic CX90/100 – Extra Heavy Duty Cavity Wall Lintel
Unlock the potential of your construction projects with the Catnic CX90/100 Lintel, expertly designed for 100mm cavities to accommodate brick and block masonry on both sides. Crafted from galvanized steel and fortified with a powder-coated finish, this lintel guarantees unparalleled durability and longevity, ensuring your structures stand the test of time.
Key Features:
Built to Last: The Catnic CX90/100 boasts galvanized steel construction and a powder-coated finish, ensuring strength and resistance against the elements for long-lasting performance.
Efficiency at its Core: Equipped with a built-in DPC (Damp Proof Course), our lintel not only saves you valuable time during installation but also provides added protection against moisture, contributing to the longevity of your construction.
Insulated Centre: The lintel's insulated centre enhances energy efficiency, making it a smart choice for projects where thermal performance is a priority.
Extra Heavy Duty Class: Classified as extra heavy duty, the Catnic CX90/100 is engineered to handle the toughest construction challenges, providing unparalleled support for various applications.
Versatile Applications:
Triangulated Masonry Load: Designed to support triangulated masonry loads, ensuring stability and reliability in your construction projects.
Uniformly Distributed Loads: Supporting uniformly distributed masonry, timber floor, and roof loads, providing flexibility in design and construction.
Fair-Faced Inner Leaf Masonry: Perfect for projects that demand a polished finish on the inner leaf masonry.
Concrete Floors Support: The lintel offers robust support for concrete floors, adding versatility to your construction options.
Attic Truss and Larger Span Loads: Designed to handle attic truss loads and larger span multiple truss loads, making it ideal for a wide range of construction applications.
Conditions of Use:
Nominal 150mm End Bearings: Ensure optimal performance with nominal 150mm end bearings, providing stability and reliability in your construction.
Simultaneous Leaf Elevation: Both leaves are raised together, streamlining the installation process for enhanced efficiency.
Pre-Installation Block Course: For optimal results, incorporate one course of block before the installation of floor/roof components.
For technical assistance, our knowledgeable support team at Catnic Technical Support is ready to guide you through every step. Elevate your construction projects with the Catnic CX90/100 Lintel – where strength, durability, and efficiency converge for exceptional results.
Due to supply shortages, we may supply aBirtley Lintel orIG Lintel as a direct alternative to a Catnic.
We will contact you once the order is placed to confirm the brand that will be provided.
Alternatively, please get in touch by phone or live chat before ordering if a specific brand is supplied.
Catnic CX90/100 100mm Extra Heavy Duty Cavity Lintel